MVP Development10 min read

10-Day MVP Framework: How We Launch Products in Record Time

Discover the exact framework GALOR uses to build and launch MVPs in just 10 days. Day-by-day breakdown, technology choices, and real case studies.

By GALOR Team

Why 10 Days? The Science Behind Fast MVP Development

The traditional software development timeline looks like this:

  • Planning: 2-4 weeks
  • Design: 2-4 weeks
  • Development: 8-16 weeks
  • Testing: 2-4 weeks
  • Total: 14-28 weeks

That's 3-7 months before you know if your idea works. By then, you've burned through budget, lost momentum, and competitors might have launched.

Our approach: Ship in 10 days, learn from real users, iterate based on data.

We've used this framework to ship 47+ products. Here's exactly how it works.

The GALOR 10-Day MVP Framework

Day 0: Discovery Call (Before the Clock Starts)

Before we start the 10-day countdown, we have a focused 60-minute discovery call to:

Define the Core Problem

  • What problem are we solving?
  • Who has this problem?
  • How are they solving it today?

Identify the Core Feature

  • What's the ONE thing this MVP must do well?
  • What features can wait for v2?
  • What's the success metric?

Set Technical Parameters

  • User types and roles
  • Key integrations needed
  • Performance requirements

Deliverable: Clear scope document with prioritized feature list


Day 1: Architecture & Setup

Morning: Technical Architecture

  • Database schema design
  • API endpoint planning
  • Authentication flow
  • Third-party integration mapping

Afternoon: Project Setup

  • Repository initialization
  • CI/CD pipeline configuration
  • Development environment setup
  • Base project structure (Next.js + TypeScript)

Key Decisions Made:

  • Database: PostgreSQL (99% of projects) or MongoDB
  • Auth: NextAuth.js or Clerk
  • Payments: Stripe
  • Hosting: Vercel or Railway

Deliverable: Working development environment, technical architecture document


Day 2: Database & Auth

Morning: Database Implementation

  • Prisma schema definition
  • Database migrations
  • Seed data creation
  • Database connection configuration

Afternoon: Authentication

  • User registration flow
  • Login/logout functionality
  • Password reset
  • OAuth integration (Google, GitHub)
  • Session management

Deliverable: Working authentication system with database


Day 3-4: Core Feature Development

This is where we build THE thing your MVP does.

Day 3: Primary Feature Backend

  • API endpoints for core functionality
  • Business logic implementation
  • Data validation
  • Error handling

Day 4: Primary Feature Frontend

  • UI components for core feature
  • State management
  • API integration
  • Loading and error states

Example: For a booking platform, Day 3-4 would be:

  • Creating/editing bookings
  • Availability calendar logic
  • Booking confirmation flow
  • Email notifications

Deliverable: Working core feature (backend + frontend)


Day 5: Secondary Features

Priority Features Only We tackle the 2-3 secondary features that are essential for launch:

Common Day 5 work:

  • User profile/settings
  • Basic dashboard
  • Search/filtering
  • Simple reporting

What We DON'T Build Yet:

  • Advanced analytics
  • Complex admin features
  • "Nice to have" features
  • Edge case handling

Deliverable: MVP feature set complete


Day 6: Admin Dashboard

Every MVP needs an admin view. We build:

Core Admin Features:

  • User management (view, edit, disable)
  • Content/data management
  • Basic metrics dashboard
  • System settings

Using Modern Tools:

  • We use shadcn/ui components for rapid admin development
  • Pre-built tables, forms, and charts
  • Dark mode included
  • Mobile-responsive by default

Deliverable: Functional admin dashboard


Day 7: Payment Integration

Stripe Integration (Standard):

  • Checkout session creation
  • Subscription management
  • Webhook handling
  • Payment success/failure flows
  • Invoice generation

What's Included:

  • One-time payments
  • Recurring subscriptions
  • Trial periods
  • Promo codes

Deliverable: Working payment system


Day 8: UI Polish & Responsiveness

Design Refinement:

  • Consistent styling across all pages
  • Animation and transitions (Framer Motion)
  • Loading states and skeletons
  • Error message UX
  • Empty states

Mobile Optimization:

  • Responsive breakpoints
  • Touch-friendly interactions
  • Mobile navigation
  • Performance optimization

Accessibility:

  • Keyboard navigation
  • Screen reader compatibility
  • Color contrast compliance
  • Focus management

Deliverable: Polished, responsive UI


Day 9: Testing & Bug Fixes

Testing Approach:

  • End-to-end testing of critical flows
  • Payment flow verification
  • Email delivery testing
  • Edge case handling

Common Bug Fixes:

  • Form validation issues
  • Mobile layout problems
  • Loading state glitches
  • API error handling

Performance Check:

  • Lighthouse score optimization
  • Image optimization
  • Code splitting
  • Database query optimization

Deliverable: Stable, tested application


Day 10: Deployment & Handover

Morning: Production Deployment

  • Production environment setup
  • Environment variables configuration
  • Domain configuration
  • SSL certificate
  • Database migration to production

Afternoon: Handover

  • Source code transfer (GitHub)
  • Documentation delivery
  • Admin credentials
  • Third-party service access
  • Post-launch support briefing

Deliverable: Live MVP + complete documentation


Technology Stack: Why These Choices?

Frontend: Next.js 14+ (App Router)

Why Next.js?

  • Server-side rendering for SEO
  • Built-in API routes
  • Automatic code splitting
  • Image optimization
  • TypeScript support
  • Massive ecosystem

Development Speed: Next.js lets us ship 2-3x faster than traditional React setups.

Backend: Node.js + Prisma

Why This Combo?

  • Full-stack TypeScript (fewer context switches)
  • Prisma's type-safe database queries
  • Easy migrations
  • Works with any SQL database

Database: PostgreSQL

Why PostgreSQL?

  • Industry standard for production
  • Excellent performance
  • Advanced features when needed
  • Free tier on most platforms

Deployment: Vercel / Railway

Why Managed Platforms?

  • Zero DevOps overhead
  • Automatic scaling
  • Preview deployments
  • Built-in monitoring
  • Generous free tiers

UI: Tailwind CSS + shadcn/ui

Why This Stack?

  • Rapid styling with Tailwind
  • Pre-built accessible components
  • Consistent design system
  • Dark mode for free
  • Highly customizable

Real Example: 10-Day MVP Timeline

Project: AI-powered document analysis platform

Day 0 (Discovery):

  • Core feature: Upload PDF → Get summary + key insights
  • Users: Small business owners
  • Success metric: 100 documents processed in first month

Day 1:

  • Set up Next.js project with TypeScript
  • Designed database schema (users, documents, analyses)
  • Planned OpenAI API integration

Day 2:

  • Implemented authentication with Clerk
  • Set up PostgreSQL with Prisma
  • Created user onboarding flow

Day 3-4:

  • Built PDF upload and processing
  • Integrated OpenAI for analysis
  • Created results display UI
  • Implemented document history

Day 5:

  • Added document search
  • Built usage dashboard
  • Implemented sharing features

Day 6:

  • Admin dashboard for monitoring
  • User management
  • Usage analytics

Day 7:

  • Stripe subscription integration
  • Free tier with limits
  • Pro tier ($29/month)

Day 8:

  • Mobile responsive design
  • Loading animations
  • Empty states
  • Error handling UI

Day 9:

  • End-to-end testing
  • Fixed 12 bugs
  • Performance optimization

Day 10:

  • Deployed to Vercel
  • Custom domain setup
  • Handed over to client

Result: Launched on time, processed 247 documents in first month, converted 8% of free users to paid.


Common Questions About the 10-Day Framework

"Can you really build a real product in 10 days?"

Yes, but with caveats:

  • Scope matters: We build MVPs, not full products
  • Experience matters: We've done this 47+ times
  • Tech matters: Modern tools make us faster
  • Focus matters: No meetings about meetings

"What if my project is too complex?"

Some projects genuinely need more than 10 days. Signs your project needs custom timeline:

  • Multiple user types with complex permissions
  • Custom AI/ML model training
  • Native mobile apps (not responsive web)
  • Complex enterprise integrations
  • Regulatory compliance requirements (HIPAA, SOC2)

For these, we offer Sprint subscriptions ($6,000/bi-weekly).

"What's NOT included in 10 days?"

  • Native iOS/Android apps (we do responsive web)
  • Custom ML model training
  • Complex enterprise integrations
  • Multi-tenant white-label systems
  • Regulatory compliance implementation

"What if you don't finish in 10 days?"

Money-back guarantee. If we don't deliver, you don't pay. Simple.


Why Most Agencies Take 3+ Months

Traditional agency overhead:

  • Meetings: 2-4 hours/week of status updates
  • Documentation: Excessive specs before coding
  • Handoffs: Designer → Developer → QA → Back to designer
  • Waterfall: No code until all designs approved
  • Padding: "Just in case" buffer time

GALOR approach:

  • Async communication: Loom videos, Slack updates
  • Design-as-you-go: Build and refine simultaneously
  • Full-stack developers: Same person does frontend + backend
  • Ship daily: Working software every day
  • No padding: 10 days means 10 days

Is the 10-Day Framework Right for You?

Perfect Fit:

  • Startup founders validating ideas
  • Businesses launching new products
  • Companies needing internal tools fast
  • Entrepreneurs with upcoming deadlines

Not Ideal For:

  • Complex enterprise software
  • Highly regulated industries (without extra time)
  • Projects with unclear requirements
  • Clients who need excessive control over process

Start Your 10-Day MVP

Ready to launch your product in 10 days?

  1. Book a discovery call - We'll assess if your project fits the 10-day framework
  2. Define scope together - Lock in exactly what we're building
  3. Start the clock - Day 1 begins after payment

Fixed $15,000 price. Money-back guarantee if we don't deliver in 10 days.

Book Your Discovery Call →

Tags
fast MVP developmentrapid prototypinglean startupagile development

READY TO BUILD YOUR MVP?

$15,000 fixed price. 10-day delivery. Money-back guarantee.

Book Free Consultation